UTNI makes environment for nature & human
> PROJECT EXPERIENCES
>
Date |
Customer |
Project / Item |
2011.12 |
METAWATER(Japan) |
GeojeYeoncho membrane filtration Water treatment plant |
2011.12 |
HiTech Engineering |
Honam Petrochemical hdpe Project(Engineering, Procurement) |
2011.12 |
HiTech Engineering |
Iidpe Plant elastomer Debottle necking |
2011.12 |
Doosan Heavy Industries&Construction |
300kW MCFC Prototype Power Plant (Movement & Installation of PCS & DC Load Bank) |
2011.10 |
NAKAMURA ELECTIRC(JAPAN) |
GS Exd. Panel, Indicator Box |
2011.10 |
SAMCHUN CHEMICAL |
Samchun Chemical Chemical dosing system(Electric & Instrument Work) |
2011.07 |
Doosan Heavy Industries&Construction |
300kW MCFC Prototype Power Plant(Electric & Instrument Work) |
2011.06 |
Doosan Heavy Industries&Construction |
300kW MCFC Stack Test Facility PLC/HMI Software Logic Improvement Work |
2011.05 |
Doosan Heavy Industries&Construction |
300kW MCFC Prototype Power Plant(System Improvement Work) |
2011.05 |
Doosan Heavy Industries&Construction |
300kW MCFC Stack Test Facility(UPS Supply) |